HALLIBURTON ARGENTINA S.A

  • Integrated reservoir study under FEL methodology for REPSOL YPF Argentina, in Comodoro, Rivadavia: steam injection pilot project, inter-spaced drilling, definition of appraisal and reservoirs production optimization study.(2007)
  • Specialized consulting in the development of exploratory and advanced reservoirs for PETROBRAS, in the Area of Neuquén. (2007)
  • Technical consulting on 3D interpretation – Geophysics for REPSOL YPF Argentina, in Comodoro Rivadavia. (2007)
  • Integrated reservoir study under FEL methodology for REPSOL YPF Argentina, in Manantiales Berh. (2008)
  • Reservoir productivity study for REPSOL YPF Argentina, in Manantiales Berh.(2008)
  • Drilling design for REPSOL YPF Argentina, in Manantiales Berh. (2008)
  • FEL for infrastructure production of the Manantiales Berh Area. (2008)
  • Integrated Research Study in Maurek. (2009)

HALLIBURTON S.A. BRANCH COLOMBIA

  • Reservoir productivity project. (2007)
  • Generation of exploratory prospects for ECOPETROL. (2008 – 2010)
  • Campo Tello and IPC Bucaramanga reservoir productivity project. (2008)
  • Design of a seismic acquisition program for ECOPETROL. (2010)
  • Small and Mature fields productivity project. (2010 – 2011)
  • Technical assistance in Well / Reservoir productivity and completion. (2010 – 2012)
  • Provision of Company Man for drilling operation. (2010 – 2012)
  • Technical assistance in drilling fluids. (2010 – 2012)
  • Technical assistance in directional drilling. (2012)

HALLIBURTON S.A. BRANCH ECUADOR

  • Technical assistance in Well / Reservoir productivity and completion. (2012)
  • Technical assistance on integrated reservoir studies. (2012)
  • Technical assistance in tertiary oil recovery. (2012)
  • Provision of Company Man for drilling operations. (2012)
  • Technical assistance in drilling fluids. (2012)
  • Technical assistance in drill bits. (2012)

HALLIBURTON ESPANOLA, S.A.

  • Technical assistance in drilling operations. (2009 – 2010)

HALLIBURTON ITALIANA, S.P.A

  • Mentoring and specialized consulting in the area of oil reservoir numerical simulation for Algeria, Africa. (2007)
  • Reservoir Evaluation to increment production. (2008)

HALLIBURTON DE MEXICO S. DE R.L DE C.V

  • Reservoir rehabilitation at the PEMEX E&P’s Activo Integral Bellota-Juno. (2005)
  • Reservoir productivity at the PEMEX E&P’s Activo Integral Bellota-Juno. (2005)
  • Technical assistance at the PEMEX E&P’s Activo de Samaria-Luna, to generate a reservoir development plan for the Integral Delta del Grijalva project, using the FEL methodology. (2006)
  • Technical assistance at the PEMEX E&P’s Activo del Litoral de Tabasco and Activo Jujo-Teco, to generate a reservoir development plan, using the FEL methodology. (2006)
  • Development of all documentation required for the “Pipeline and Transport Process and its Infrastructure” Project of the PEMEX E&P’s Activo Integral Cinco Presidentes. (2006)
  • Development of all documentation required for the Complejo Antonio J. Bermúdez Integrated Project, using the FEL methodology, for the Pipeline and Transport Process.
  • Infrastructure Optimization of the PEMEX E&P’s Activo Integral Samaria-Luna. (2006)
  • Technical assistance at the PEMEX E&P’s Activo de Samaria-Luna, with a heavy oil project at Campo Samaria, as well as the development of static and dynamic reservoir models. (2006)
  • Technical assistance and consulting of the usage of the DSS tool, at the PEMEX E&P’s Activo Litoral de Tabasco. (2006)
  • Technical assistance and consulting in prospect generation at the PEMEX E&P’s Activo Integral Cinco Presidentes of Campo Blasillo. (2006)
  • Generation of an integrated development plan for the Cactus Sitio Grande field of the Activo Integral Muspac, using the FEL methodology, stages C & V; focusing on generating multiple scenarios, based on the risk and uncertainties, to be able to select the most profitable option in order to maximize de reserves recovery. (2006)
  • Specialized technical assistance on reservoir engineering of the PEMEX E&P’s Activo Integral Cantarell – Exploration Design Department. (2006 – 2007)
  • Technical assistance to implement the reservoir productivity methodology, as well as assisting with the coordination of the a field development plan for the PEMEX E&P’s Activo Integral Abkatun Pol Chuc. (2006 – 2007)
  • Technical assistance in monitoring well interventions in real time (RTO) at the PEMEX E&P’s Activo Integral Cantarell. (2006 – 2007)
  • Technical assistance to implement the reservoir productivity methodology, as well as assisting with the coordination of a field development plan for the PEMEX E&P’s Activo Integral Ku Maloob Zaap. (2007)
  • Integrated reservoir studies, reservoir productivity and in-fill drilling for PEMEX. (2008 – 2012)
  • In-fill drilling project, Alianza II Project for PEMEX. (2009)
  • Development of FEL for PEMEX, south division. (2010 – 2011)
  • Integrated reservoir studies, utilizing the FEL methodology for PEMEX E&P. (2009 – 2012)
  • Reservoir productivity project for PEMEX E&P. (2009 – 2012)
  • Consulting in Reservoir Simulation during eclipse for PEMEX E&P. (2010 – 2012)

PEMEX EXPLORATION & PRODUCTION

  • Updating and maintenance of the production and transportation systems simulation models of the PEMEX E&P’s Activo Integral Cantarell. (2002 – 2006)

SCHLUMBERGER ECUADOR

  • Technical assistance on Integrated reservoir studies. (2012)
  • Technical assistance in the area of tertiary oil recovery. (2012)
  • Provision of Company Man for drilling operations. (2012)

SCHLUMBERGER MEXICO

  • Consulting in Reservoir Simulation during eclipse for PEMEX E&P. (2005 – 2012)
  • Reservoir productivity project for PEMEX E&P. (2006 – 2010)
  • Field Development study to increase oil recovery. (2006 – 2012)
  • Petrophysics consulting for PEMEX E&P. (2007 – 2012)
  • Reservoir studies, production and hydraulic fracturing. (2008)
  • Real time monitoring for an exploratory deep-water drilling project. (2008-2009)
  • Reservoir economical study, using the Merak tool for PEMEX E&P. (2008 – 2012)
  • Detailed best practice study in hydraulic fracturing, utilizing state of art descriptive and predictive data population techniques. (2009)
  • Technical assistance in oil enhanced recovery projects by using air and CO2, at the PEMEX E&P’s Activo Cinco Presidentes. (2009)
  • Reservoir Simulation integrated studies for PEMEX E&P’s Activo de Chicontepec. (2009 – 2012)

SCHLUMBERGER TECHNOLOGY CORPORATION

  • Execution of a gas lift optimization project in Activo Cantarell, EPC-05 project through Honeywell – Baker Jardine. (2001 – 2002)
  • Consulting project to diagnose operating conditions of network distribution systems, to design and optimization proposal for the production plants of the Activo Burgos, Reynosa. (2002 – 2003)